Lu Xiao-wu
2011
Citations
0
Citations
Journal
Coal Engineering
Abstract
In order to ensure the construction quality of the exposed wall thermal insulation project with XPS polyphenyl boards,during the construction preparation period,the construction acceptance code and technical standards should be seriously studied,the requirements of the energy saving design should be analyzed and the common problems in the energy saving construction should be understood.The detail regulations of the supervision should be prepared for the energy saving construction project.The special plan of the energy saving construction should be provided for the approval.The quality control spots and other quality pre-control measures should be set up.The technical exchanges should be conducted between the supervision unit and the construction unit.The quality control work should be well conducted during the construction period.The side standing,inspection tour and parallel inspection as well as other measures should be applied to the effective control of construction quality for the exposed wall thermal insulation construction with XPS polyphenyl boards.